Lesson Plan |
Name of Faculty : Will Be Assigned |
Discipline : B.TECH (ME) |
Semester : 7TH |
Subject & Subject Code : REFRIGERATION & AIR CONDITIONING LAB & ME-411-F |
Lesson Plan Duration : 15 Weeks (from July, 2018 to November, 2018) |
Work Load (Practical ) per week (in hours) : Practical-4 |
Practical |
Practical Day |
Topic |
1st -G1 |
To study the vapour compression Refrigeration System and determine its C.O.P. and draw P-H and T-S diagrams |
1st –G2 |
2nd-G1 |
To Study the Mechanical heat pump and find its C.O.P. |
2nd-G2 |
3rd-G1 |
To study the Air and Water heat pump and find its C.O.P. |
3rd-G2 |
4th-G1 |
To study the cut- sectional models of Reciprocating and Rotary Refrigerant compressor. |
4th-G2 |
5th-G1 |
To study the various controls used in Refrigerating & Air Conditioning systems. |
5th-G2 |
6th-G1 |
To study the Ice- plant, its working cycle and determine its C.O.P and capacity. |
6th-G2 |
7th-G1 |
To study the humidification, heating, cooling and dehumidification processes and plot them on Psychrometric charts. |
7th-G2 |
8th-G1 |
To determine the By-pass factor of Heating & Cooling coils and plot them on Psychrometric charts on different inlet conditions. |
8th-G2 |
9th-G1 |
To determine sensible heat factor of Air on re-circulated air-conditioning set up. |
9th-G2 |
10th-G1 |
To study the chilling plant and its working cycle. |
10th-G2 |